| 000 | 00945pam a2200313 a 4500 | ||
|---|---|---|---|
| 999 |
_c7985 _d7985 |
||
| 001 | 11671 | ||
| 003 | BD-ChUET | ||
| 005 | 20191113103020.0 | ||
| 008 | 820913s1983 nyua b 001 0 eng | ||
| 010 | _a 82017316 | ||
| 020 |
_a0471864358 _c$44.95 (est.) |
||
| 040 |
_aDLC _cDLC _dBD-ChUET |
||
| 050 | 0 | 0 |
_aTH435 _b.A33 1983 |
| 082 | 0 | 0 |
_a624.0681/AHS _219 |
| 100 | 1 | 0 | _aAhuja, Hira N. |
| 245 | 1 | 0 |
_aSuccessful methods in cost engineering / _cHira N. Ahuja and Michael A. Walsh. |
| 260 |
_aNew York : _bWiley, _cc1983. |
||
| 300 |
_axv, 379 p. : _bill. ; _c24 cm. |
||
| 440 | 0 |
_aConstruction management and engineering, _x0193-9750 |
|
| 500 | _aIncludes index. | ||
| 504 | _aBibliography: (p. 372-374). | ||
| 526 | _aCE | ||
| 546 | _aenglish | ||
| 650 | 0 |
_aBuilding _xEstimates. |
|
| 650 | 0 | _aValue analysis (Cost control) | |
| 700 | 1 | _aWalsh, Michael A. | |
| 906 |
_a7 _bcbc _corignew _d1 _eocip _f19 _gy-gencatlg |
||
| 942 |
_2ddc _cBK |
||